Who to call about a street, park or sidewalk problem
Streets, parks and sidewalks answer to different offices. Here is who does what in Lindale Park, and who to call.
Plain answers to the questions neighbors ask us about the City, the County and the projects shaping the neighborhood. Each page points to its sources, so you can check it yourself.
Step-by-step help for the questions we hear most.
Streets, parks and sidewalks answer to different offices. Here is who does what in Lindale Park, and who to call.
Speed cushions have about a 10 year wait. See the steps, the costs and where things stand in Lindale Park, with 311 as your first call.
Who handles which tree, how to ask for one, the rules for planting on City property, and what to expect when CenterPoint trims near power lines.
Counts from the project list, November 27, 2026.
Four of the nine projects that touch the neighborhood. Each has a status, so you can see how far along it is.
Planning / StudyTxDOT plans to rebuild I-45 from I-10 to Loop 610, including the Loop 610 interchange.
Planning / StudyA 3.6-mile extension south from I-610 into downtown, led by the Harris County Toll Road Authority.
A new two-story, 32,000-square-foot branch at 705 Cavalcade, with an outdoor pool.
In designMedian planting and safer crossings at five intersections along Cavalcade.
Dates to watch in and near Lindale Park, from each project's page. Schedules shift, so check the agency named on the project card. Dates as listed on the project cards, November 27, 2026.
6 to 8 PM at HCDE Adult Education, 6515 Irvington Boulevard. A resident survey is also open.
Project detailsThe Greater Northside Management District's project page lists a completion estimated for late fall 2026.
Project detailsConstruction is expected to start in 2027, with the new two-story branch at 705 Cavalcade.
Project detailsInstallation is scheduled to finish by the end of 2027.
Project detailsLikely no earlier than the 2030s. TxDOT's Segment 2 page still lists 2028, but final design has not begun and is waiting on funding, and TxDOT's schedule for the connecting downtown work runs to 2035/2036.
TxDOT: Segment 2 · TxDOT downtown schedule, July 2026Is there a question you wish we would answer? Write to [email protected].